The back bunker on #8 Weiskopf has been an eyesore. The outfall drain was clogged, the bunker sand was no good and it had no edge and weeds all over it. We opened the drain, removed all the sand and edged it up. In the spring, we will add a liner and new sand, along with sod for the lower edge.  We will wait for the spring, so the sand will be fresh and ready to go out of the gate.



All the sand removed.  Drain lines clean.  Ready for liner and sand in the spring