Wednesday, June 25, 2014

Rain

As of 5:00pm Monday night we were already at 1.3" of rain. I'm sure by now we are well over 2". It's going to be a wet couple days so please obey the cart rules and allow the course to dry out.


Jeff unclogging the drain on #7 Devlin

Why the drain needed unclogged

Sunday, June 22, 2014

Weiskopf halfway house

The landscape around the Weiskopf halfway house needed a major upgrade. We started this spring immediately around the building with the bushes, grasses and roses. We mulched and made the area look much better, but the whole area coming from # 6 Weiskopf still did not look good. We gave some of the seasonal employees a task to make it look better, gave them some leeway and they made it look great. Thanks to Eric and Doug Jeddy, Ken DiCillo, Ross Dawson and Matt Thomas for turning an eyesore into a much better area.


Before

After

Tuesday, June 17, 2014

Sprinkler heads all at once

This morning we had a broken hydraulic pipe at around 9am.  With our old irrigation system on the Devlin, this caused all the sprinkler heads to come on all at once.  Once the hydraulic system loses pressure there is no way to get the sprinkler heads down without valving off the system and waiting for the water to bleed out.  It is one of those worst case scenarios. We wanted the golf course to be as dry and healthy as possible during this heat stretch and adding extra water is not what we intended.  Everything will be alright and we apologize for the inconvenience this caused on the Devlin golf course this morning.  If you have any questions please give me a call or send me an email.  Thank you.

Tuesday, June 3, 2014

Cart barn putting green aeration

Today we finished up our spring aerification. We had done both courses and the other two putting greens this spring, but had left the cart barn green untouched so there was always a putting green without holes in it. We will leave it closed for a few days and have it opened for the weekend. This is the only green we did and the other 38 are in great shape and will not have a core pulled on them until fall. 


Saturday, May 24, 2014

Bunker project

The bunker project on the Weiskopf course is starting to wrap up. The crew from Golf Creations did a great job and would have been done in less than two weeks. Weather the past two weeks delayed them from spraying the last 16 bunkers with the Better Billy Bunker polymer liner. The moisture in the gravel must be less than 15% and they have to have a certain temperature to get a good spray. They have worked the past two days trying to finish the project this weekend. The ones that are complete turned out great. We will do everything we can over the next few months to pack the sand. The new sand will be fluffy for a short amount of time until it gets packed in much better.


Golf Creations spraying the polymer

over 400 tons of sand were delivered yesterday

#3 Finished product from the tee

#4 Finished

Thursday, May 8, 2014

Sand bottles

In the past there have been sand buckets with seed on the par three tees. This year we have removed the buckets because we are filling the divots everyday with sand and seed as part of the morning setup. This allows the divots to be taken care of daily and one less thing for the mowers and setup guys to move. As part of morning setup, they are trained to empty trash, move tee markers, seed and sand divots, change water coolers and check ball washers(this has been added as it was not getting done ). Please still take sand bottles from your cart to fill divots on the tees as there will no longer be buckets. We are working with the pro shop staff to make sure the bottles stands on #7 Weiskopf and #10 Devlin will have replacement bottles when you are out of sand. 

Thursday, May 1, 2014

Valve project coming along

One if the main reasons of the capital valve project was to completely isolate the irrigation on the Devlin course from the Weiskopf. The valve that shut down the Devlin would not shut all the way. Precision Golf came in and put a new valve to isolate the Devlin. Between 8-10 more isolation valves will be replaced or added and all the holes that have been dug will be gone. They should finish up early next week.



8" main shutoff valve for the Devlin