![]() |
| Prepped and leveled DR tee |
![]() |
| Laying the sod |
![]() |
| All finished. Turned out great. |
![]() |
| Better Billy Bunker raked with rake placement not to interfere with shots |
![]() |
![]() |
| Looking across the hole |
![]() |
| Digging up and repairing each drainage break |
![]() |
| Lance did a great job finding each break and leading a crew to make the area better |
![]() |
| Lance, Tommy and Charles adding more drainage to even better dry out the area |
![]() |
| #8 Devlin before we started. Notice all the sand mix into the grass |
![]() |
| Crew moving sand around to right depths and pulling sand off the edges |
![]() |
| Crisp finished product after weedeating the edges and raking |
![]() |
| Much better defined visual from far away |